Client: Lucan, Co Dublin, Ireland.
The project consisted of dining room extension to two storey house. Paving and brick work edging of patio area. Landscaping gardens.
Installation of Velux Window. UPVC Fascia and Soffit.
Client: Carrick On Shannon Co Roscommon Ireland
The project consisted of Six Bay Steel Framed building. Two Number Livestock yards, One Number Concrete Silage Slab and Concrete
Tank to store the effluent from the livestock. The project was for the Department of Agriculture and Food under the Farm Waste
Management (FWN) scheme.
Client: Department of Agriculture, Fisheries and Food. Dunmore East Co Waterford Ireland.
Bridgeform Ltd was subcontracted in to Project Manage the Project on behalf of the Main contractor. The project consists of repairs to East Pier
Phase 2 and Upgrade of Access to West Wharf. The works consisted of the following activities:
Partial resurfacing of the East Pier with an in-situ concrete deck slab. Laying of Six Number Ducts, extension of an existing watermain and a new
surface drainage system consisting of gully pots going to an oil interceptor which then discharges through a tideflex valve.
Construction of a Pre Cast concrete retaining wall along the line of the West Wharf and across from the West Wharf. Construction of an in-situ
concrete slab between the edge of the Synchrolift Compound and the West Wharf to create an access that allows HGV traffic on to the West Wharf.